top of page

GBM Works gaining visibility in the offshore market

The GBM Works installation methods are gaining attention. Recently I was interviewed by RVO, which asked me how their subsidy helped us in making steps forward developing environmental friendly installation methods, and what could serve us in the near future. Their MOOI subsidy program fit perfectly our needs. see the link: https://www.topsectorenergie.nl/spotlight/nederlands-consortium-onderzoekt-stille-funderingsmethode-voor-wind-op-zee


Dutch Offshore consortium GROW Offshore invited GBM Works to participate in a program (called SIMOX) which will lead to a certified silent installation method in 3 years from now. GBM‘s studies on soil resistance reduction in cooperation with Deltares have convinced the industry that the GBM team can contribute to such a method. Read more on: https://www.grow-offshorewind.nl/news



Test site at Deltares

Recente blogposts

Alles weergeven

Ben Arntz

With this message, we would like to give attention to the decision of Ben Arntz to leave GBM Works. Ben founded the company with Nick Noordam in 2016 to prevent harmful noise to marine life during off

Comments


bottom of page